Coal Combustion Residuals (CCR) collection and transport system for Ghent Power Station
We provided a Coal Combustion Residuals (CCR) collection and transport system to Ghent Power Station, Kentucky Utilities’ largest coal-fired power plant with a generating capacity of 1,932 megawatts. From the respective daily storage areas, each of the CCR materials are reclaimed onto series of conveyors.
![](https://www.beumergroup.com/app/uploads/dynamic/2019/05/Ghent-126-1920px-1280x0-c-default.jpg)
Transport from the transfer building to the truck loadout building
![](https://www.beumergroup.com/app/uploads/dynamic/2019/05/Ghent-145-570px-400x0-c-default.jpg)
The purpose of the pipe conveyor is to transport fly ash, bottom ash and gypsum from the transfer building near the power plant to the truck loadout building over a distance of 2387 m. The system includes plant belt conveyors, a gypsum storage hall fed by a shuttle conveyor, bulk reception units, chain conveyors, a dual auger reclaim system and the pipe conveyor.
Technical Data
![](https://www.beumergroup.com/app/uploads/dynamic/2021/02/Alexander-Tigges-800px-2-660x0-c-default.png)
Do you have any questions?
Do you have any questions?
Your Contact Person
Alexander Tigges
Director Global Sales Minerals & Mining